Vigyata.AI
Is this your channel?

Sick Day? Not When You're a Contractor

1.7K views· 182 likes· 25:03· Mar 29, 2026

🛍️ Products Mentioned (1)

Being a contractor at Green Hawk Construction means that no matter how you're feeling, the jobs won't wait. As a reputable construction company, we have a responsibility to our clients to deliver high-quality site work, renovations, and new construction projects on time. Whether we're working on a new build, laying foundation, or pouring concrete, our team of experienced builders and contractors are dedicated to getting the job done. At Green Hawk Construction, we take pride in our work and strive to be the best home builder in the business, providing top-notch construction life solutions for our clients. From the initial planning stages to the final walk-through, we're committed to making every building project a success, even when our team members are feeling under the weather. In this video, we'll take a closer look at what it's like to work in the construction industry when you're not feeling your best, and how our team at Green Hawk Construction perseveres to deliver exceptional results. CLICK ON THE LINK FOR YOUR FREE 14 DAY TRADIFY TRIAL USE PROMO CODE GHAWK30 FOR 30% OFF FOR THE FIRST 3 MONTHS LINK👉 https://bit.ly/3OOBB2q

About This Video

This one starts a bit different because I’ve not been very well. Dizziness, sickness, chest pains, pins and needles in my hands and head — the lot. My wife rang an ambulance and I ended up in A&E and intensive care while they tried to work out what’s going on, with more tests still to come (CT scan, heart checks, etc). And yeah, even sat there I’m saying, “I’m out in the morning, aren’t I? I’ve got concrete coming tomorrow.” That’s the tradesperson mentality, but it’s also stupid — you’ve got to look after yourself. Because I couldn’t be on site, Steve did the filming for concrete day on the rear extension/big build — 100mm insulation down, DPM in, then the slab pour. After that I get back in for what I can manage and rattle through some second-fix electrics in the downstairs loo/washing machine area: marking and drilling downlights with the laser, fitting JCC V50s (colour selectable), setting them to cool white, then doing a simple 1-gang switch with Wagos (773-102s), sleeving, and dressing it so it’s a tidy job. Big takeaway: being a contractor means the job doesn’t stop when you’re ill — so you need proper systems. Tradify has been a godsend for us because everything’s in one place and rescheduling clients is straightforward, which takes a massive layer of pressure off when life happens.

Frequently Asked Questions

🎬 More from Green Hawk Electrical