Roofing Day 3 Working at Height and Near Disasters

1.4K views· 127 likes· 11:39· Apr 26, 2026

Join Green Hawk Construction, a leading roofing company, as we document our roofing journey on day 3, focusing on the importance of working at height safely and the potential near disasters that can occur in the roofing industry. As a reputable roofing contractor, we understand the risks involved in roof installation, roof maintenance, and roof repair, and we take every precaution to ensure the safety of our team and clients. At Green Hawk Construction, we pride ourselves on being a trusted construction contractor, providing top-notch services to our clients. In this video, we share our experiences, challenges, and lessons learned while working on a roofing project, highlighting the need for careful planning, attention to detail, and adherence to safety protocols. Our goal is to educate and inform viewers about the roofing industry, while also showcasing our expertise and commitment to delivering exceptional results as a roofing company. By watching this video, you will gain insight into the world of roofing and the importance of hiring a professional roofing contractor like Green Hawk Construction for all your roofing needs.

About This Video

Day 3 on this rear extension and it’s all about getting the roof closed up, tying the old into the new, and not having an “absolute disaster” while I’m trying to film it. I’d already nearly binned the drone first thing (oh the joys of making content), then it was straight back onto the tricky bit—making mismatched pitches and an awkward junction behave themselves. We’ve already got one side felted and battened, and today was about sorting the other side and getting the valley properly proven. We did a very “scientific” test on the valley—bucket of water, poured it down, and fair play, it worked spot on. No spillage, water collected exactly where it should, and it never got anywhere near where it could cause grief. After that it was felt and battening, working out tile spacing so you don’t end up with weird gauges, then planning the battening around the Velux opening. We stopped short on tiling because we’re waiting on the Velux windows, which are now in stock and due tomorrow. Big takeaway: play to your strengths and leave the ego at the door. Steve’s miles ahead of me on the roofing side, so I’m cutting, measuring, loading out and generally being the dogsbody—because that’s what makes the job run. Tomorrow I’m back on first fix electrics in the extension, then we crack on once the Velux turns up.

Frequently Asked Questions

🎬 More from Green Hawk Electrical